TIL a 2x4 screwed to my mortar board keeps the mud from sliding off
I was losing about a third of every batch of mud off the back of my board on scaffold work, especially up high where the tilt gets steep. Last Tuesday I screwed a scrap 2x4 along the back edge as a lip, and it held every batch the whole pour on a garage job in Akron. The board sits flatter now and I stop scraping mud off the planks every 20 minutes. It cost me one scrap board and two deck screws. I also put a small block on the front corner so my trowel has a spot to sit. Anyone else rig their board like this, or do you just buy one with a lip already on it?