Picked bag mix over ready mix for a 12x12 shed pad in Lubbock, and it actually worked out
Could not get a truck out to the back alley so I hand mixed 84 bags with a buddy over a Saturday. My arms hated me but the finish came out flat and no cracks 3 weeks in. Anyone else pour small pads by hand or do you just wait for the truck?