Hot take: an old bench lead's advice about chasing grounds on the King Air panel saved me a 6 hour shift
Two years back a guy named Ray who ran the avionics bench at our shop in Tulsa handed me a radio harness and said "fix the ground before you touch the box, it's almost always the ground." I nodded and forgot it, because the squawk sheet said the unit itself was bad. Last Tuesday the same intermittent comm issue showed up on a B200 and I finally took his advice, found a corroded ground stud behind the panel, and had it signed off in under 20 minutes. Ray retired in 2021 and I never got to tell him he was right. Any of you have an old timer's rule that sounds lazy but keeps being true?