Walked into the new hotel job in Tulsa and the subfloor was so bad I almost packed my knee kicker back up
Got the call to bid a 40 room hotel refit over on the east side of Tulsa and I went out Tuesday to walk it before giving a number. Stretch-in over pad, nothing fancy, except the GC had his guy pour self leveler over old ply and it looks like a lake out there. I put my 6 foot straight edge down and there's a dip a half inch deep in room 214 and it rolls the same way in about 6 other rooms. I've laid over worse, don't get me wrong, but a hotel means furniture and rolling luggage carts over every seam for 10 years, and a dip like that will pop a seam before the first busy weekend. Told the GC the floor needs to be flat within an eighth over 10 feet before I touch it, he acted like I was asking for the moon. Now I'm sitting here with the bid half wrote wondering if I eat the leveling cost or walk. Any of you take a flatness fight with a GC on a job this size, and how did you get him to hear you without losing the whole thing?