Showerthought: picking between a wet bell and a dry bell on the Smith Mountain job, still not sure I got it right
Last month we had a bell run at Smith Mountain and I had to pick between pushing a wet bell or a dry bell for the 60 foot working depth. I went dry because the pump guy swore the air would stay cleaner, but the surface decompression schedule ate up 22 extra minutes per shift and the tender was not happy. Looking back I think the wet bell would have kept us moving faster, but I have only run dry twice so who knows. Any of you run both setups enough to say which one you trust more on a job that shallow?