Pro tip: label every cable before you pull a rack, I learned this the hard way at a client site in Mesa
Three years ago I pulled a whole 48-port patch panel out without tagging a single cable, thinking I could trace it back by memory. Twenty minutes later I had a nest of Cat6 and a client whose phone system was down while I stood there guessing. Now I bring a roll of masking tape and a Sharpie and I tag both ends of every run before I touch anything, it adds maybe 15 minutes to a job. Last month a switch swap in Mesa that used to take me two hours took 40 minutes because the tagging made the rebuild mindless. I get techs who say labeling slows them down and I think that is just ego talking. What is your go to method for labeling, tape, printed labels, or do you actually trust those numbered velcro wraps?
Watched a buddy of mine do the exact same thing on a job in Tempe, pulled a 24 port panel with zero tags and swore he had it memorized. He spent the next morning buzzing out lines one at a time while the office staff worked off a couple of hot spots and complained. He tags everything now, and he uses the cheap printer labels on both ends plus a number on the jacket so he can match them up fast. The velcro wraps are fine for bundles but I would not trust them on their own since the numbers fade or the wrap slides off. The guys who say it slows them down have clearly never eaten a whole day fixing their own mess.