Lost 3 hours and $200 on a bad glue job in Phoenix
Tried a new brand of moisture cure urethane last week, Vulkem 350, for a LVP install near Phoenix. Stuff kicked off in the bucket before I even got half the room laid, total waste. Had to tear it all up and scrape the subfloor with a razor, cost me a full afternoon and two hundred bucks in material. Anybody else get burned by a glue that sets up way too fast in the heat?
Guess I should've brought a thermometer and a cheat sheet for the daily temperature swings. Did you find that out the hard way or just reading the label?