19
Tightened up our beam placement with a quick check step
On a recent site, we added a quick level check before locking in the beams. It caught a couple of small slips before they became problems. The crew liked how it kept things moving smooth. We wrapped up that section faster than planned. Just a little tip that paid off.
2 comments
Log in to join the discussion
Log In2 Comments
burns.michael22h ago
That bit about catching small slips is key. My friend skipped the level check on a roof job once. He had to pull down three beams that were already set. It wasted a whole morning. Now his crew does that quick step every time and they never have to backtrack.
6
jessep1615h ago
I read about a contractor who avoided a big redo by spotting a lean early. @burns.michael, that's the kind of catch your friend missed but now gets right.
7