I think everyone is wrong about using 3D modeling for every single detail drawing.
Just finished a big set of shop drawings for a steel fabricator in Phoenix. The lead engineer wanted every single bolt, weld symbol, and connection plate modeled in full 3D. It took my team three weeks. For the next similar job, I pushed back and did the main structure in 3D but all the connection details as 2D views with standard notes. That set took five days and the shop had zero questions. The extra 3D detail didn't add clarity, it just added time and file size. When is a 3D model actually needed versus just showing it cleanly in 2D?