Spent 4 hours on a paver patio only to have it sink in the first rain
I was out in my backyard in Austin last month, finally tackling that paver patio I'd been putting off. Laid everything out, tamped it down real good with my hand tamper, and thought I had it sorted. Then a random thunderstorm rolled through and the whole corner just dropped like 2 inches overnight. Turns out I didn't dig out deep enough for the base gravel, maybe only 3 inches instead of the 6 they recommend. Now I'm hauling all these heavy stones back up and redoing the whole section this weekend. Has anyone else had their paver base fail like that, or am I just bad at reading soil?